The First Stage of “Eastern Siberia - Pacific Ocean” Pipeline System. Section “2205 – 2281km”

The First Stage of "Eastern Siberia -  Pacific Ocean" Pipeline System. Section "2205 - 2281km"

 In autumn 2006, the JSC "Ural Power Engineering Construction Company" proceeded to the construction of the project"The First Stage of the Pipeline System "Western Siberia - Pacific Ocean".

The length of the 10 kV OHTL along the oil pipe-line section "2205 - 2281 km" is equal to 76 km.  

The trunk digital radio-relay lines are under construction at the oil pipe-line section "570 - 1105 km" "parallel" to the route of the designed pipe-line.   

The entire package of construction and installation, start-up and commissioning works includes:

  • The construction of 10 kV OHTL.
  • The construction of access roads to the radio-relay stations.
  • Installation, start-up and commissioning of communication and auxiliary systems.
  • Starting tests, plant handover for commissioning.